AI Terminal
Design Hub
BOQ & Meas.
Concrete Calc
File Explorer
System Stats
ERP Metrics
Vasthu Plan
GST Bills
AI Command Shell
Welcome to CTAK Command Shell v1.0.0.
System initialization complete. Type 'help' to begin.
ctak@os:~$
Design Hub
Projects
BOQ & Measurement Manager
Select Construction Site:
Loading sites...
BOQ Items
Measurements
Select a site to view BOQ data
Concrete Grade & Quantity Calculator
Concrete Grade
M20 (1 : 1.5 : 3)
M25 (1 : 1 : 2)
M15 (1 : 2 : 4)
M10 (1 : 3 : 6)
M7.5 (1 : 4 : 8)
M5 (1 : 5 : 10)
Length (m)
Width (m)
Thickness / Height (m)
Calculate Quantities
Required Materials:
Wet Volume
0.00
m³
Dry Volume (+54%)
0.00
m³
Cement Required
0.0
bags
(
0
kg)
Sand Required
0.00
cft
Aggregate Required
0.00
cft
File Explorer
Workspace
uploads
Text Editor
Cancel
Save File
System Dashboard
Laptop Resource Utilization
CPU Usage
0%
RAM Usage
0%
Disk Storage
0%
Server:
Loading...
Tailscale Online
ERP Live Metrics
Total Sites
1
Active Project
Golden Villa Project
Financial Summary
Allocated Budget
₹25,00,000
Actual Spend
₹14,50,000
Variance
-42.0%
Vasthu Drawing Requirement Collector
Intakes List
C
CTAK
API Active
00:00:00
A
System Administrator
Role: Admin
AI Command Shell
Design Hub
BOQ & Meas.
Concrete Calc
File Explorer
System Stats
ERP metrics
Vasthu Plan
CTAK Construction v1.0.0
IP: 77.42.22.154